Prior to extract the tree from plantation area, the first thing must be built is access road, canal, base camp for worker and workshop for equipment and tools maintenance. PT Trakindo Utama has the best option for infrastructure preparation through Cat Hydraulic Excavator (320D2, 313D2 LGP), Cat Track Type Tractors / Dozer (D5R XL, D6R XL), Cat Motor Grader (120K), and Cat Vibratory Soil Compactor (CS-533).